Project Profile: Integrated Cold Chain Infrastructure
- Pankaj Pawar
- Jun 27, 2020
- 2 min read
Updated: Aug 8, 2020

Project Description With a view to carving out a niche for Indian horticulture produce and for ensuring an appropriate standard in exports, APEDA through a development of integrated facility such as of pack house to intending exporters in super cession of the Horticulture Produce.
The objective of this pack house is to encourage exporters of horticultural produce to meet the international standards in terms of quality of produce with quarantine safety.
The pack house development as per the requirement for material handling, holding, pre-inspection, shorting, grading, washing, standard treatment, packaging, stacking, pre-cooling, cold storage, quarantine check etc., encouragement to backward linkages, maintain the traceability, export of good quality produce, promotion and publicity at the international level, encouraging adoption of internationally acceptable standards and practices, upgradation of standards for product quality, hygiene, food safety, and creation of a healthy, competitive environment among exporters.
Possible Facilities · F&V Sorting Grading and Washing
· Packaging Facilities
· Ripening Chamber
· CA Storage
· Frozen Storage
· IQF
· Food Testing Lab
· Plant Quarantine Room
· Refrigerated Vehicle
· Various Utilities
Raw Material Locally Available Horticulture Products.
Land Area Requirement Land should be located near to the growing Agri-cluster area easily connected with the Transportation Facility. The Project Land/Building should also have easy availability of the water and electricity. The ideal land require for the project is minimum 6000 Sq. Mtr
Components
The project cost for the eligibility would consist of:
Farm Level Infrastructure: Processing center mentioned above in Processing Activities.
Distribution hub: This shall have a modern multi-product, multi-temperature cold storage.
Transport: Refrigerated vans/ refrigerated trucks/ insulated vans/mobile insulated tankers.
Cost of Project (In Lakhs)
Civil Work: : 200.00
Storage Facilities (CA Storage, Ripening Chamber, Refrigerated Vehicle) : 350.00
Value Addition Facilities
(IQF, Frozen Storage etc.) : 150.00
Other Expenses : 50.00
(i.e. Preoperative, Contingencies, IDC etc.)
Total Cost (In Lakhs) : 750.00
Means of Finance
Promoter Contribution : 160.00
Bank Loan : 210.00
MoFPI Subsidy/ Grant : 380.00
Total Cost (In Lakhs) : 750.00
Above mentioned project details and cost is tentative it may vary on actual project cost calculation.
Subsidy by Central Government (MoFPI)
•Ceiling upto 5 Crore
•35% for General Areas
•50% for Himalayan States
•50% for North Eastern India
•50% for SC/ ST
•Under the Pradhan Mantri Kisan Sampada Yojana
Subsidy by State Government
(Reference: https://www.aecengg.com/food-state-government)
•From 25 to 50%
•Capital Subsidy
•Interest Subsidy
•Air/ Sea Freight Subsidy
•GST Incentives
•Electricity Rate and Stamp Duty
Our Services
•Detailed Project Report
•Assistance for Bank Loan
•Project Planning and Feasibility Study
•Project Implementation
•Monitoring and Evaluation Services
•Supply Chain Management
•Agriculture Advisory Services
•Product Development
•FSSAI License Service

Address: 1 - B-307, Swagat Rainforest-2, Kudasan, Gujarat 382421
Address: 2 - AEC, Village: Bhag Khera, Jind, Haryana
Phone : +91 84888 68449, +91 9016448449, +91- 9958000178
Email : aec.jind@gmail.com
Website : https://www.aecengg.com/
Comments